Difference between revisions of "Information system"
From EPC Standard
information_system>Ileising |
|||
(One intermediate revision by the same user not shown) | |||
Line 28: | Line 28: | ||
</div> | </div> | ||
</div> | </div> | ||
+ | [[Category:Meta Model]] |
Latest revision as of 14:10, 15 January 2021
Information system | |
---|---|
Graphical Notation | |
There is no image yet, do you want to upload one? | |
IsSubClassOf | IsSubClassOf::Resource |
Successors | hasSuccessor::Information system |
Predecessors | hasPredecessor::Information system |
HasIncomingControlFlow | hasIncomingControlFlow::0 |
HasOutgoingControlFlow | hasOutgoingControlFlow::0 |
HasResource | hasResource::0 |
HasAttribute | hasAttribute::0 |
Edit the Properties |
Brief Information
This is an autogenerated section!
You are not able to edit this information by hand, but by edit the Form (and therefore the properties) of this page. Please refer to the Edit the properties link at the bottom of the info box. {{#show: Information system | ?Is a | Intro=The Information system is a }}. {{#show: Information system | ?contains | Intro=It contains }}. {{#show: Information system | ?hasSuccessor | Intro=Possible succeeding element(s) is/are }}. {{#show: Information system | ?hasPredecessor | Intro=Previous element(s) can be }}. {{#show: Information system | ?hasIncomingControlFlow | Intro=The cardinalities are | Outro= (incoming)}} {{#show: Information system | ?hasOutgoingControlFlow | Intro=and | Outro= (outgoing) respectively }}. {{#show: Information system | ?refersTo | Intro=The Information system refers to }}. {{#show: Information system | ?attachedTo | Intro=The Information system is attached to a }}.
Syntax
An information system is an additional resource that is added to a function by a straight line without arrow. [1]
Relation type
An information system is connected to a function by an input output flow connector. [2]
Extensions
iEPC. [3]
References
- [*1] G. Decker and W. Tscheschner, “Migration von EPK zu BPMN,” EPK 2009. 8. Work. der Gesellschaft für Inform. e.V. und Treffen ihres Arbeitkreises "Geschäftsprozessmanagement mit Ereignisgesteuerten Prozessketten (WI-EPK). Gesellschaft für Inform., pp. 91–109, 2009.
- [*2] B. Korherr and B. List, “A UML 2 Profile for Event Driven Process Chains *,” vol. 205, pp. 161–172, 2006.
- [*3] L. Rosa, H. M. Arthur, M. La, and M. Dumas, Configurable Multi-Perspective Business Process Models. 2010.